EXHIBIT C

RESPONSIBILITIES OF THE COLLEGE

The Vice President for Administrative and Information Services shall furnish the CONSULTANT, so far as the work hereunder may require, free of all cost, the following information:

a. A Topographical Survey (wherever applicable) of the site showing the grades and lines of the streets, pavements and adjoining properties as well as the location and character of existing buildings now on the site and on adjoining properties; the rights, restrictions and easements affecting the site; the boundaries and elevations of the site, including available information as to existing sewer, gas, water and electrical services.

b. Boring drawings and boring samples. These will be provided to the extent they are available. (Does not apply to modernizations or projects where no exterior building is involved.)

c. Sample Bid Documents.

d. For projects in which existing buildings are involved, the Vice President for Administrative and Information Services will provide such plans and specifications as are available to him, but the Vice President for Administrative and Information Services does not guarantee their correctness in relation to existing conditions, original installation or changes made thereafter. All drawings, specifications and data of the structure furnished by the Vice President for Administrative and Information Services shall be field checked by the CONSULTANT to verify existing conditions.

e. Copy of COUNTY construction standards that the CONSULTANT is to follow in the preparation of drawings and specifications where and when applicable.

END OF EXHIBIT C

[ SCCC HOME ]   [ ADMINISTRATIVE AND INFORMATION SERVICES ]   [ FACILITY/PROJECT MANAGEMENT ]

[ CONSULTANT AGREEMENT ]    [ EXHIBIT A ]     [ EXHIBIT B ]     [ EXHIBIT C ]
[ EXHIBIT D ]      [ EXHIBIT E ]      [ EXHIBIT F ]      [ EXHIBIT L ]